Multiple Directory Report
Summary
Based on the original reports, the software can merge the reports automatically. This is especially suitable for the scenarios such as batch data processing and cross projection band data processing. Click to add the working directories need to be processed. Click to remove the selected working directory. Click to clear the working directory list. Click the list item to confirm the working directory information.
Confirm information
After adding the working directories, click the list item to confirm the working directory information.
- Start Tower Name: The name of starting tower.
- End Tower Name: The name of ending tower.
- Point Cloud SRS: The coordinate system of the point cloud.
Settings
- Data Type: Select the data type to be processed. The data type includes point cloud based data, vector based data, and data based on working conditions simulation. The software can record the user's current settings and automatically restore the settings when opened again.
- Based on Point Cloud: Extract the powerline data from the original point cloud data.
- Based on Vector Data: Extract the powerline data from the vector file, and other classes objects from original point cloud data.
- Based on Simulation Data: Extract the powerline data from the simulation file, and other classes objects from original point cloud data.
- Detection Type: User can select multiple options. Set the detection type, and generate corresponding reports.
- Clearance Danger: Clear the clearance danger point detection result in the cache folder.
- Scissors Crossing: Clear the scissors crossing point detection result in the cache folder.
- Tree Fall: Clear the tree fall detection result in the cache folder.
- Tree Growth: Clear the tree growth detection result in the cache folder.
- Generate Report: Set the parameters for report generation.
- Assessor Company: The company which generates the report.
- Electrical Bureau: The name of power supply bureau or company.
- Line Name: The name of the power line section.
- Voltage Level: Cannot be changed by user.
- Collection Date: The date on which point cloud was collected.
- Target Coordinate: The coordinate system used in the report.
- Report Path: The output path of the report.
- Other:
- Display in Degrees(Latitude and Longitude): The coordinates are displayed in longitude, latitude, or radians.
- Simulation File: If user choose to generate the report based on the simulated working conditions data, it is required to set the simulation file (*.LiSim file).
Note: To ensure the order of automatic merge, please add the working directories in order.