Scissors Crossing Double Line Simulation Analysis

Summary

Based on the result of working conditions simulation, analyze the distance between current line and crossing line. Clickto add the vector data to be processed. Clickto remove the selected vector data(remove the first record of the list if no data is selected). Click to clear the vector data list.

Usage

Click Early Warning Analysis > Scissors Crossing Double Line Simulation Analysis

Scissors Crossing Double Line Simulation Analysis

Settings

  • Analysis Parameter:

    Clickto add the current line and crossing line. Click to modify selected line. Clickto remove selected line. Clickto clear line list.

    • Buffer Size: Adjust channel width.
      Line Setting
  • Line Settings:

    • Crossing Line Option: Select the crossing type and the working conditions simulation file for crossing lines. Crossing types include scissors crossing up and scissors crossing down.
    • Current Line Option: Select the current line type and the current line working conditions simulation file. Line Type include shield line and power line.
  • Report(check by default): Check to generate an analysis report based on the analysis result file. If not checked, no report will be generated.
    • Assessor Company: The company which generates the report.
    • Electrical Transmission Bureau / Company: The name of power supply bureau or company.
    • Line Name: Line name.
    • Collection Date: The date on which point cloud was collected.
    • Target Coordinate: The coordinate system used in the report.
    • Report Path: The output path of the report.
  • Threads Num(default value is "4"): Set the number of thread (1 to 32) to run this function. The software can record the currently setting and when the user open this function again, the setting will be kept.

results matching ""

    No results matching ""